CEM 410/510 Construction Project ManagementCredits: (3-0) 3
Course addresses advanced study and application of estimating, scheduling, and project control principles utilized within the construction industry. Course will make extensive use of computer modeling in the analysis and development of realistic construction estimates and schedules. Conceptual, assembly, and detailed estimating topics are addressed. Network, linear, matrix, and bar chart schedules are analyzed. Project control topics including cost, resource, and schedule control are addressed and applied to cash flow analysis, project duration optimization, and resource balancing problems.
Prerequisites: CEE 274 Notes: Students enrolled in CEM 510 will be held to a higher standard than those enrolled in CEM 410.
|
|